CylindriCurves

Custom machine

We have the possibility to design the guiding surfaces that meet your specifications.

A drawing of the can end is required, at least 100 samples, the treatment length and machine speed.

Then we come back to you with a draft of the solution.

If it’s approved, we start the generation of the surfaces.

Deliverables are .txt files containing the curves required to build the parts.

Lead time is approximately 2 weeks.

(It is the responsibility of the customer to design, build the machine and validate its performances.)

Example of deliverables :

You just have to import the curves on your CAD software and connect the curves to make the surfaces.